docs: finalize handoff 64 — issues closed, tree clean

Bring handoff-64 current: it was written just before #22/#24 were closed
and the docs commit landed. §1 now reflects HEAD f0afec3 with both
issues closed on Gitea; §6 removes the completed finalization steps and
points the next session at the open requirements backlog (§7).
This commit is contained in:
claude@clouddev1
2026-06-11 12:08:12 +00:00
parent f0afec3812
commit 5d9ef6b21f
+14 -11
View File
@@ -8,9 +8,8 @@ to end across three phases + a restyle).
## §1. State at handoff
**Branch:** `main`. **HEAD `2d0f4b2`** plus an **uncommitted docs
finalization** (ADR-0047 status → implemented, README index, this
handoff — see §6). Push is the user's step.
**Branch:** `main`. **HEAD `f0afec3`** — all work committed, nothing
pending. Unpushed (push is the user's step; normal working state).
**Tests: 2290 passing / 0 failing / 0 skipped / 1 ignored** (the 1
ignored is the long-standing `friendly` doctest). **Clippy clean**
@@ -18,6 +17,7 @@ ignored is the long-standing `friendly` doctest). **Clippy clean**
**This session's commits:**
```
f0afec3 docs: session handoff 64 + ADR-0047 implemented (#22/#24)
2d0f4b2 feat(ui): flat filled rectangles for demo overlays (#22, ADR-0047 D4)
241f60c feat(ui): demo-mode step-caption stealth buffer (#22, ADR-0047 D3/D4)
2584e76 feat(ui): demo-mode keystroke badges (#22, ADR-0047 D2/D4/D5)
@@ -26,8 +26,9 @@ e9eb1b1 docs: ADR-0047 — demonstration overlay layer for casts/teaching (#22)
638b4c9 feat(app): vi-style j/k/g/G navigation in the load picker (#24)
```
**Issues closed:** **#24** (vi nav) and **#22** (demo overlays) — close
#22 once the docs finalization commit lands.
**Issues closed:** both **#24** (vi nav) and **#22** (demo overlays) are
**closed on Gitea** with closing comments — verified via the filtered
issue list. Nothing left open from this session's scope.
## §2. #24 — vi-style load-picker navigation (commit `638b4c9`)
@@ -107,13 +108,15 @@ existing `IndicatorDebounce` already takes. A future Tier-4 PTY harness
## §6. How to take over
**Nothing is pending from this session** — both issues are closed, all
docs landed (`f0afec3`), tree is green. The next session **returns to the
open requirements backlog** (§7). Suggested start: run `/whatsnext`
(it reads this handoff), or pick from §7 below.
1. Read handoffs 62 → 63 → 64, `CLAUDE.md`, `docs/requirements.md`,
`docs/adr/README.md`, and **ADR-0047** (fully landed).
2. **Pending:** the docs finalization commit (ADR-0047 status →
implemented; README index; this handoff). Commit as
`docs: session handoff 64 + ADR-0047 implemented (#22/#24)` (the user
confirms commit messages). Then close **#22** on Gitea.
3. **For demo-overlay work:** `App` has `demo_mode`, `demo_badge`,
`docs/adr/README.md`. ADR-0047 is fully landed; revisit only for
demo-overlay follow-ups.
2. **For demo-overlay work:** `App` has `demo_mode`, `demo_badge`,
`demo_badge_seq`, `demo_caption`, `demo_caption_capturing`,
`demo_caption_buffer`, `last_output_area`. Rendering:
`render_demo_overlays` / `render_badge_box` / `render_caption_box` /