ca71184678
Adds docs/handoff/20260508-handoff-2.md describing the state at the end of this session: ADR-0015 designed, Iterations 1-4 of track 2 shipped (file-backed projects with auto-named [temp] dirs, per-command write-through, rebuild from text on missing .db, save/save as/new/load/rebuild commands with modal dialogs and project switching), plus the cleanup pass (--help, in-app help, post-rebuild message, unmodified-temp cleanup) and the safety hardening of safely_delete_temp_project. Lists the next-up moves (Iteration 5: export/import, Iteration 6: --resume + persistent input history + migration scaffold) and an end-to-end smoke test. requirements.md: marks P1-P5, P-NAME-1/2/3, F1, F2, U3, L1 as [x] with iteration references; adds P-CLEAN-1 for the safe cleanup; updates A1, I2, H3, L1a progress notes. CLAUDE.md: updates the project-storage decisions and deferred-items entry to reflect what's now live vs. still pending.