Adds the rest of the track-2 lifecycle commands (ADR-0015 §11)
and the project-switching machinery they need at runtime.
Temp vs named distinction: replaced the fragile naming heuristic
with an explicit `[temp]` marker in the directory pattern
(`<YYYYMMDD>-[temp]-<word>-<word>-<word>`). validate_user_name
already rejects brackets, so user-typed names can never collide
with a temp marker. The status bar shows `[TEMP] <Display Name>`
for temp projects; the prettifier strips both the date and the
marker so display names are clean.
save / save as: temp project's `save` opens a path-entry modal
(acts as save as); named project's `save` reports "already
auto-saved; use `save as`". `save as` always prompts. Relative
names resolve under <data-root>/projects/; absolute paths used
as-is. Copy excludes the per-process lock file; everything else
(.db, yaml, csvs, history.log) is copied.
new: closes current project, creates a fresh auto-named temp,
switches.
load: opens a picker. List sub-mode shows projects in the active
data root, sorted newest-first by project.yaml mtime; arrow keys
navigate, Enter loads, `b` switches to a path-entry sub-mode for
projects elsewhere, Esc cancels. Empty data root jumps straight
to path entry.
Runtime: `Session` holds Option<Project> + Option<Database> so
project switches can drop old (releasing lock + stopping worker)
before opening new -- required for the "load my own current
project" case. `perform_switch` handles Load / SaveAs / NewTemp
uniformly.
Tests: 332 passing (270 lib + 9 + 5 + 6 + 16 new + 9 + 17),
0 failing, 0 skipped. Clippy clean.
Replaces the in-memory database with an on-disk project. Startup either
opens a project at the positional CLI path (L1) or creates an auto-named
temp project (<YYYYMMDD>-<word>-<word>-<word>) under the OS-standard
data directory or a --data-dir override. The new project::Project type
owns the directory skeleton and a PID+hostname lock file with
stale-lock takeover via sysinfo. The status bar now shows
"Project: <Display Name>", derived by a small kebab/snake/camel
prettifier. Per-command persistence to YAML/CSV/history.log is NOT
yet wired -- that's Iteration 2; for now playground.db carries the
state across quits.
Tests: 257 passing (231 lib + 9 new integration + 17 existing),
0 failing, 0 skipped. Clippy clean with nursery lints.